Return to front page

Newest article: Re: Boro 6 Sutton 2 by Vernon2Yesterday 21:26Yesterday at 21:26:16view thread

Oldest article: JG to Coalville? by MJNB4/2/2024 13:30Sun Feb 4 13:30:03 2024view thread

MenuSearch

Next thread: Theme tune by Wolfman8/2/2024 13:36Thu Feb 8 13:36:56 2024view thread

Electronically Operated Turnstiles

By VoR8/2/2024 13:30Thu Feb 8 13:30:19 2024

Views: 778

For clarification, the main choice for external use is between a half-height turnstile or a full-height turnstile.

A half-height turnstile would be suitable for installation at any local football ground/sports ground.

A full-height turnstile would be suitable/advisable for new Stadium construction.

Just as a reminder now:-

The FA's ground-grading requirements for Level 11/Step 7 include for the installation of 1Nr turnstile.

IMO, a half-height turnstile would satisfy this requirement.

Edited by VoR at 13:30:41 on 8th February 2024

reply to this article | return to the front page

Next article in this thread: Re: Electronically Operated Turnstiles by Boropod8/2/2024 18:34Thu Feb 8 18:34:55 2024

Previous thread: Next team in trouble by Spurs and Verde 8/2/2024 15:36Thu Feb 8 15:36:45 2024view thread